Commercial & Industrial Cleaning

Subscan provides a range of Commercial & Industrial cleaning solutions to complement our core business activities. Whether it is graffiti removal or car park cleaning, we have got the capability to leave your site looking good as new.

  • Car Park Cleaning and Restoration
  • Graffiti Removal
  • High Level Building Cleaning
  • Construction Site Cleaning
  • Hot Wash Steam Cleaning

Why Subscan?

At Subscan we work with you to establish a time that is least disruptive to your business’ daily operations – remaining prompt and professional at all hours of the day. With cutting edge technology on hand for all sectors, Subscan can provide comprehensive Commercial & Industrial cleaning service to meet your needs. At Subscan we are constantly developing and implementing advances in modern technology to enhance the way we provide maintenance work to all clients.

Integrated Survey Specialists

Working in conjunction with our Utility and Survey departments, Subscan are able to provide an integrated survey solution that is unique in the market place. Our extensive survey offering means that many of our clients save time and money when appointing us to their project due to the efficiencies achieved from appointing only one contractor.

Case Study

Client:
A One +

Project type:
CCTV drainage survey, drain cleansing, de silting

Location:
A64, North and West Yorkshire

Overview

Reactive turnkey solution to remove blockage from a vital culvert on a stretch of highway. Subscan worked throughout the night to minimise disruption to local community.

Subscan were appointed on emergency works as a vital culvert was blocked under the A64, causing major flooding across the highway. As the only major transport link from Leeds to the East Coast, the drainage solution caused a huge problem to the general public.

Our team were tasked in removing all excess water on the highway using our fleet of jet vac tankers. Once all of the water was removed our team completed a detailed CCTV drainage survey to locate the blockage. The culvert required de silting and cleansing to restore the flow to the structure.

The works were carried out over three nights shifts and 8 tonnes of silt removed from site.  All flow was restored, and the highway was back to full operation.

Client Testimonial

“The Subscan UDS team of surveyors and drainage engineers helped our minor works team out again and did a thoroughly professional job. We will continue to work with Subscan on LNE projects throughout the region.”

Lee Sanderson, Building & Civils Project Manager, Construction Marine Ltd